Renewing the plot

London Road Station Partnership Blog

There’s been a lot of renewal work going on at London Rd Station during November, helped by the dry(ish) weather. The wet weather in the first part of the year really did for our raised beds. Already in May, we realised the corner posts of our central beds were rotting. The rot got progressively worse until we had to tie the old scaffolding planks together with leads and bang in a couple of temporary boards to retain the long shady bed against the wall.

Given that these were our first raised beds, constructed from used scaffolding boards back in 2011, it’s not surprising they were collapsing. The key detail we discovered later when we constructed the fruit tree beds along the south facing wall: make sure you line the beds with pond liner or equivalent to keep the moisture from the wood.

And so it was that we decided to…

View original post 393 more words

Advertisements